Minimization of water consumption and reconstruction and optimization of wastewater treatment plant of Sugar Production plant
(03)
System Spec
2000 m3/d Sugar Industrial WWTP (Equalization tank – Anaerobic and Aerobic Bioprocess - Clarifier – Disinfection)
Year
2024
Industry
Industrial Wastewater Treatment
Problem
High Water Consumption Under-design WWTP and Lack of treatment capability Effluent COD was over 2000 mg/l High energy consumption in pump station
Consulting services
- Preparation of water mass balance in the plant - Investigation of the existing condition of the WWTP. - Design an innovative mechanical distributor for distributing feed into the treatment modules - Re-design the biological treatment systems considering the highest possible treatment capacity - Process optimization and operation manual preparation