Minimization of water consumption and reconstruction and optimization of wastewater treatment plant of Sugar Production plant

(03)

System Spec

2000 m3/d Sugar Industrial WWTP (Equalization tank – Anaerobic and Aerobic Bioprocess - Clarifier – Disinfection)

Year

2024

Industry

Industrial Wastewater Treatment

Problem

High Water Consumption Under-design WWTP and Lack of treatment capability Effluent COD was over 2000 mg/l High energy consumption in pump station

Consulting services

- Preparation of water mass balance in the plant - Investigation of the existing condition of the WWTP. - Design an innovative mechanical distributor for distributing feed into the treatment modules - Re-design the biological treatment systems considering the highest possible treatment capacity - Process optimization and operation manual preparation